The intervention to adapt the car park involved the partial rehabilitation of the structures, building and plant engineering works with the adaptation to current regulations, in particular regarding fire prevention regulations.
We have dealt with: design of building works, executive design of systems, construction site safety design, construction management
The multi-level underground car park is located near the airport.
It was necessary to intervene on the accesses and ramps in such a way as to divide the structure into various compartments.
The lighting present in the building was replaced with LED-type lighting fixtures and an adequate safety lighting system was created.
The automatic shutdown and smoke detection system has been expanded and adapted to cover uncovered areas.
The electrical power system has been modified by replacing the generator set power supply with a new dedicated power point.
The accumulation tank for the fire-fighting system has been resized and enlarged in order to guarantee the necessary water reserve volumes.
Natural ventilation has been integrated with a mechanical system to guarantee the necessary air changes in case of need.
Total area:
20,000 m2
Main parametric data:
Power supply system in LV 400V Fire booster unit
Total amount of works:
€1,200,000
2013
Verona, Italy
Transport